ROUGH TERRAIN CRANE 25 TONNE AT PENGERANG PROJECT OIL & GAS
June 2016, Kenda starting to work at Pengerang, Johor. The most intensive oil and gas activity in Malaysia is presently carried out in Johor, where located in Tanjung Bin, Tanjung Langsat and Pengerang districts. Johor state also allocated 20,000 acres of land in Pengerang District for Pengerang Integrated Petroleum Complex (PIPC) which accommodate of PETRONAS RAPID and DIALOG-Vopak Pengerang Deepwater Terminal (PDT).
Oil and gas contractor in Pengerang has appointed us to supply three Rough Terrain Crane, which range from 25 tonne to 50 tonne for a three year contract award. The crane we supply including the supply of under hook appliances and our experienced operator to carry out the heavy lifts in a challenging site condition.
Oil and gas contractor in Pengerang has appointed us to supply three Rough Terrain Crane, which range from 25 tonne to 50 tonne for a three year contract award. The crane we supply including the supply of under hook appliances and our experienced operator to carry out the heavy lifts in a challenging site condition.